A full strip-out and rebuild as a warm roof, finished with fully bonded Elevate EPDM.

The problem
This flat roof was originally installed in 2010 with no vapour control layer (VCL) and inadequate ventilation. The deck had severely deteriorated from long-term condensation — sweating from the inside out — and in places was unsafe to walk on, with extensive timber decay.



Works completed

Build-up: new decking → fully bonded white VCL → TR27 rigid insulation (thermal-break fixings) → Elevate EPDM, fully bonded



The result
Improved thermal performance, condensation control and long-term weather protection.