A full strip-out and rebuild as a warm roof, finished with fully bonded Elevate EPDM.

Completed warm flat roof

The problem

Condensation from the inside out

This flat roof was originally installed in 2010 with no vapour control layer (VCL) and inadequate ventilation. The deck had severely deteriorated from long-term condensation — sweating from the inside out — and in places was unsafe to walk on, with extensive timber decay.

Before — failed, ponding roof
Before — decayed deck, full strip-out
Before — decayed deck, full strip-out
Before — rotted timber & saturated insulation
Before — rotted timber & saturated insulation

Works completed

Rebuilt as a proper warm roof

Fully bonded white VCL barrier

The right build-up, in the right order

  • Removed all decayed timber and defective materials
  • Raised and adjusted the roof lantern
  • Installed new structural roof decking
  • Fitted a high-performance Vapour Control Layer (VCL)
  • Installed TR27 rigid insulation
  • Finished with a fully bonded Elevate EPDM membrane

Build-up: new decking → fully bonded white VCL → TR27 rigid insulation (thermal-break fixings) → Elevate EPDM, fully bonded

VCL dressed to the edges
VCL dressed to the edges
TR27 insulation fitted
TR27 insulation fitted
Finished Elevate EPDM
Finished Elevate EPDM

The result

Warm, watertight & efficient

Improved thermal performance, condensation control and long-term weather protection.